Solar and Battery Installation Inspection Checklist (Free)
Work through a full solar and battery inspection in the same order Pat does on site: switchboard, battery, roof, then testing. Use it to check your own work before an inspector or a CER audit does.
Most failed inspections come down to the same few things: missing labels, earthing, loose cabling and tests that were skipped. This free checklist covers all of them in order, with tick boxes and a place to record your readings, so you can sign a job off knowing it is ready for approval.
What’s included
14 sections in inspection order, from switchboard to roof
Earthing, insulation resistance and backup tests with pass values
Labelling, cabling and mounting checks inspectors look for
Free — no catch
Your presenter
Pat Southwell — Licensed Electrical Inspector
Pat inspects solar and battery systems across Victoria every week. Every checklist we publish is built from what he actually finds on site.